Q&A
Q01
After buying the machine, can we edit the winding programs ourselves later on when a new product is planned.
Yes, winding program editing is available easily through the HMI with a well trained personnel from you.
Q02
Will DETZO provide complete training for the programming?
Complete training could be scheduled upon Factory acceptance in Taiwan or Site Acceptance in your factory.
Q03
Will Detzo provide 2D/3D drawing of the machine?
We can provide the 2D PDF drawing of tooling and contact parts, but not structure or complete machine drawings.
Q04
After buying an individual machine, can we upgrade and integrate it into a automatic machine line in the future?
If there's a posiibility of developing into an automatic machine line in the future, it has to be planned from the beginning.
Space for structure has to reserved so that it can be joined with other machines.
Q05
Can we use the consumable parts which has the same specification but different brand from local?
It can only be used with the consent of DETZO. If you use parts of different brands without approval, DETZO will not be responsible.